You don't have javascript enabled. Good luck with that.
Pencarian
 Normalisasi Saluran di Jalan Patra Rampung
.
photo Rudi Hermawan - Beritajakarta.id

Water Channels Normalization in Duri Kepa Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed normalization of the water channels on Jalan Patra and Mangga I, Duri Kepa, Kebon Jeruk.

Surely we do this work to handle flooding on such roads when it rains

Development and Improvement of Drainage Division Head Imam Prasetyo said, channel normalization on Jalan Patra was carried out along 325 meters with 150 centimeters width and 150 centimeters depth. As for the Jalan Mangga, the channel was normalized up to 145 meters length and 80 centimeters depth.

"It is started on October 22 and is finished on December 10," he expressed, Monday (12/28).

Mampang Prapatan SDA Dredges Micro Channel in Pondok Jaya

By doing so, the channel was expected to maximally accommodate water and to smoothen water flow into the artificial pond to be immediately streamed to the Sekretaris River.

"Surely we do this work to handle flooding on such roads when it rains," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye353 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik