You don't have javascript enabled. Good luck with that.
Pencarian
 Normalisasi Saluran di Jalan Patra Rampung
.
photo Rudi Hermawan - Beritajakarta.id

Water Channels Normalization in Duri Kepa Completed

The West Jakarta Water Resources (SDA) Sub-agency has completed normalization of the water channels on Jalan Patra and Mangga I, Duri Kepa, Kebon Jeruk.

Surely we do this work to handle flooding on such roads when it rains

Development and Improvement of Drainage Division Head Imam Prasetyo said, channel normalization on Jalan Patra was carried out along 325 meters with 150 centimeters width and 150 centimeters depth. As for the Jalan Mangga, the channel was normalized up to 145 meters length and 80 centimeters depth.

"It is started on October 22 and is finished on December 10," he expressed, Monday (12/28).

Mampang Prapatan SDA Dredges Micro Channel in Pondok Jaya

By doing so, the channel was expected to maximally accommodate water and to smoothen water flow into the artificial pond to be immediately streamed to the Sekretaris River.

"Surely we do this work to handle flooding on such roads when it rains," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1043 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye551 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye384 personAldi Geri Lumban Tobing